Source: Pennenergy
ADA-ES Inc. (NASDAQ: ADES) signed a contract to supply between 11 and 20 activated carbon injection systems for a fleet of coal-fired power plants owned and operated by an unnamed U.S. power producer.
ADA said in a release that work will begin immediately. The systems are scheduled for delivery between late summer 2013 and the end of 2014. The systems will be used to help the power plants comply with the U.S. Environmental Protection Agency’s Mercury and Air Toxics Standard.